Guides for homeowners: Kitchen extensions: what to decide before you build

A kitchen extension is the most popular reason to extend. These are the decisions worth making early, before the design is fixed.

Finished kitchen with black units, built in ovens and a brick feature wall

A kitchen extension changes how the whole ground floor works. It is worth spending time on the decisions below before the drawings are final, because they affect the structure, the services and the cost.

Layout and use

Start with how you want to live in the space. A kitchen and dining room, a kitchen with a seating area, or a family room that includes the kitchen all need different shapes. Think about where the cooking happens, where people sit and how the room connects to the garden and the rest of the house. A side-return extension, built into the narrow strip beside the house, works differently from a rear extension.

Light and glazing

Extensions can end up dark in the middle if the house blocks the light. Large doors, rooflights and roof lanterns bring light in. Bi-fold, sliding or French doors open the room to the garden, and they carry structural and cost implications. Our guide to opening up the back of your house explains them.

The opening into the house

Joining the extension to the house usually means opening up the existing back wall, and that is often structural. If it is load-bearing it needs a steel beam, calculations and building control sign-off. See what is involved. Where the opening goes decides how the old and new spaces connect.

Services and heating

Where the sink, hob and appliances go decides where the drains, gas, water and electrics need to run. Moving the sink to a new position means new waste pipes, so it is better to plan this early. Think about heating too: underfloor heating, extending the radiators or a mix. All of it should be agreed before the floor is laid.

The kitchen itself

Choose the kitchen early. Units and appliances can take time to arrive, and the design affects where the sockets, plumbing and lighting go. The builder needs the final plan, with appliance sizes, to set the services out correctly.

Paperwork

A single-storey kitchen extension may fall under permitted development. See extending without planning permission. Building regulations apply either way, and if the extension is by a boundary, the Party Wall Act may apply. For cost, see what changes the price of an extension.

Common mistakes

  • Not enough storage. A bigger room needs more cupboards, not fewer.
  • Too few sockets. Plan them around the worktops and the island, not just the walls.
  • Forgetting ventilation. A larger cooking space needs a proper extractor.
  • Moving the sink late. Changing the position after the floor is laid means digging it up again.
  • A dark middle. If the room is deep, one set of doors at the end may not be enough light. Consider rooflights.
  • Unplanned appliance sizes. The builder needs the final sizes to set the services out correctly.

Common questions

Can I keep using my kitchen while the extension is built?

Often yes, until the wall between the old kitchen and the extension is opened. After that, most people set up a temporary kitchen. Ask your builder to plan this with you.

Should I choose the kitchen before the build starts?

Yes, or at least settle the layout. The positions of the sink, hob and appliances decide where the drains, gas, water and electrics go.

Do I need to move my boiler or gas supply?

Not always, but if the extension covers an external wall where services run, they may have to be moved. It is better to find that out at the design stage.

Planning a kitchen extension?

Send a few photos and your postcode, or give us a ring. Quotes are free and there is no obligation.