Guides for homeowners: Knocking two rooms into one: what is involved?

More than taking a wall down. Here are the steps, in the order they happen, and what each means for your home.

Brick wall being opened up between two rooms

Opening two rooms into one is one of the most popular changes to a family home. It is also structural work, so the order things happen in matters. This is what a knock-through usually involves.

1. Find out what the wall does

The first question is whether the wall is holding anything up. Some are only dividing a space. Others carry the floor or roof above. Our guide to load-bearing walls covers the signs to look for, but only a proper inspection can confirm it. Never start taking a wall down on a guess.

2. The structural engineer

If the wall is load-bearing, a structural engineer works out how to carry that load once the wall is gone. They calculate the size of the steel beam, often called an RSJ, and what it will rest on at each end. Building control will want to see those calculations.

3. Building control

Removing a load-bearing wall is a structural alteration, so it needs building regulations approval. The building control team checks the calculations and inspects the work, and when it is signed off you get a completion certificate. Keep it. A buyer's solicitor will ask for it when you sell.

4. The work itself

The wall does not simply come out. The usual order is:

  • temporary supports go in to hold the floor or ceiling above;
  • the wall is taken down, and the opening prepared for the beam;
  • the steel beam goes in, resting on solid bearings at each end;
  • the beam is fire-protected where that is required, and the supports are removed;
  • any cables, pipes or radiators that ran through the wall are re-routed.

5. Making good

This is the part that makes it look like the wall was never there: plastering the ceiling and the new reveals, repairing or matching the floor where the wall stood, and decorating. It is worth agreeing how far the quote goes, because some quotes stop at the structure and leave the finish for you to arrange. Expect dust. Doors and furniture should be protected, and a tidy team will sheet off the rest of the house.

What affects the cost

The span of the opening, the size of the beam, how much has to be re-routed, how much of the finishing is included, and the engineer's and building control fees all play a part. Ask for a quote that says clearly what is and is not included.

Alistair can look at the wall, arrange the engineer and building control, and do the work and the finishing. See our renovations page, or get in touch for a free quote.

Common questions

Can I stay in the house?

Usually yes. Expect noise and dust, and plan around the rooms being worked on.

What if the wall is not load-bearing?

The work is simpler, with no steel beam and no engineer's calculations, though pipes, cables and radiators in the wall still have to be dealt with. Check with building control whether approval is needed.

Does opening up rooms affect fire safety?

It can. Opening up the ground floor may change the escape route from upstairs, and building control will look at that. It is one reason to involve them early.

What about the ceiling and floor?

A new beam leaves a gap in the ceiling and, where the wall was, a line in the floor. Agree in the quote how these are made good. See how an extension is built for how finishing fits into a bigger project.

Planning a knock-through?

Send a few photos and your postcode, or give us a ring. Quotes are free and there is no obligation.

01303 478058
Call now Free quote
WhatsApp us