Planning permission is often not needed for a garage conversion, but building regulations nearly always are. They are separate rules, with a separate application, and they are about whether the new room is safe, warm and properly built. Our guide to planning permission for garage conversions covers the first question. This one covers the second.
How the process works
You apply to building control before work starts. That can be your council's building control team or a registered building control approver. There are two usual routes: a full plans application, where drawings are checked and approved first, or a building notice, where work starts after notice is given and is checked on site. For a conversion that changes the structure, such as filling in the garage door opening, full plans is the more common choice. Ask Alistair which suits your job.
What gets checked
The rules are set out in the government's Approved Documents, and they can change, so always check the current versions. In practice, building control looks at the same handful of things on a garage:
- The structure. The wall that fills the old door opening, and the foundation underneath it.
- The floor and damp. Garage floors often sit lower than the house and have no damp-proof layer, so the floor usually needs damp proofing and insulating.
- Insulation and heating. The walls, floor and ceiling need to meet current energy standards, and the room needs to be heated.
- Ventilation and light. A new window, and ways to get fresh air in and damp air out. A bathroom needs its own extraction.
- Fire safety. Smoke alarms, and a safe way out of the room. A bedroom may need an escape window or a route to an outside door.
- Electrics. New circuits are notifiable work and must be done by a registered electrician, or inspected by building control.
- Drainage. If the conversion includes an en-suite, how the waste connects to the existing drains.
Inspections along the way
Building control visits at stages, not just at the end. Typical stages are the foundation for the new wall, the floor and damp proofing, the insulation before it is covered, any drainage, and a final inspection. The key point is that the work has to be left open until it has been seen. That is one reason to have a builder who knows the process and plans the job around the inspections.
The completion certificate
When the final inspection is passed you receive a completion certificate. Keep it with your house documents. A buyer's solicitor will ask for it when you sell, and a missing certificate can hold a sale up.
Converted without approval?
If a garage was converted before you bought the house and there is no certificate, or you did work yourself without telling building control, you can usually apply to the council for a regularisation certificate. They may need to open up parts of the work to inspect it. If you are buying a house with a converted garage, ask for the certificate before you exchange.
Want it done properly?
Alistair can arrange the drawings and building control as part of the job, so you deal with one team. See the garage conversions page, or read what changes the cost of a garage conversion.
Common questions
Do I need building regulations for a garage used as a gym or office?
Yes, if you are converting it to a habitable space. A change of use from a garage to a living space generally needs approval, whatever the room is used for.
Who pays building control fees?
You do, as the owner. Fees vary between councils and approvers, so ask for a quote. A good builder will include or explain them.
Can I do the electrics myself?
New circuits are notifiable work, so it has to be carried out by a registered electrician or inspected by building control.